西安生态园林酒店圆桌会议中心钢结构大板梁安装技术

作者:黄文华 黄伟 白海 焦建东
单位:中冶上海)钢结构科技有限公司
摘要:通过对西安生态园林酒店圆桌会议中心钢结构大板梁施工经验进行总结,得到影响大板梁安装质量的主要因素。通过分析现场实测数据,总结分段拼装控制起拱值的方法,利用吊装吊点控制大板梁吊装变形,在拼装和安装阶段综合考虑环境温度变化对大板梁的变形影响后,优化高强螺栓群节点为栓焊节点,保证安装精度、质量,及结构安全,且提前竣工。
关键词:钢结构安装大板梁螺栓节点质量控制
作者简介:黄文华,高级工程师,E-mail:540304900@qq.com。
基金: -页码-:81-84
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] 中冶京诚工程技术有限公司.钢结构设计标准:GB 50017—2017[S].北京:中国建筑工业出版社,2017.
[2] 贾志军,刘庆明.提高钢结构高强螺栓过孔率的有效途径[J].钢结构,2006(4):81-83.
[3] LEE S S,MOON T S.Moment-rotation model of semi-rigid connections with angles[J].Engineering structures,2002,24(2):227-237.
[4] IHADDOUDENEA,SAIDANI M,CHEMROUK M.Mechanical model for the analysis of steel frames with semi rigid joints [J].Journal of constructional steel research,2009,65(3):631-640.
[5] 王元清,杨文,石永久.加固用栓焊并用连接受力性能有限元分析[J].钢结构,2006(4):23-27.
[6] 中冶建筑研究总院有限公司.钢结构高强螺栓连接技术规程:JGJ 82—2011[S].北京:中国建筑工业出版社,2011.
[7] 靳龙,高中庸,李健.摩擦型钢结构连接件抗滑移系数的测定[J].广西工学院学报,2001,12(4):23-25.
[8] 虞戚芳.主次梁承压型高强度螺栓连接节点受力性能研究[D].武汉:武汉理工大学,2009.
Installation Technology of Large Plate Beam of Steel Structure in Xi'an Ecological Garden Hotel Roundtable Conference Center
HUANG Wenhua HUANG Wei BAI Hai JIAO Jiong
(MCC (Shanghai) Steel Structure Technology Co., Ltd.)
Abstract: Through the summary of the construction experience of large plate beam of steel structure in the roundtable conference center of Xi'an Ecological Garden Hotel, the main factors affecting the installation quality of the beam are obtained. Based on the analysis of the field measured data, this paper summarizes the method of controlling the arching value by sectional assembly, and uses the lifting point to control the lifting deformation of the large plate beam. In the assembly and installation stage, after considering the influence of the environmental temperature change on the deformation of the large plate beam, the high-strength bolt group node is optimized as the bolt welding node, so as to ensure the installation accuracy, quality, and structural safety, and the construction is completed ahead of schedule.
Keywords: steel structures; installation; large plate beam; bolt joints; quality control