施工顺序对大跨钢结构桩基位移影响分析

引用文献:

张丽讷 梁岩 管品武 余政. 施工顺序对大跨钢结构桩基位移影响分析[J]. 建筑结构,2022,48(24):126-130.

ZHANG Line LIANG Yan GUAN Pinwu YU Zheng. Analysis on influence of construction sequence on displacement of pile foundation for large-span steel structure[J]. Building Structure,2022,48(24):126-130.

作者:张丽讷 梁岩 管品武 余政
单位:郑州大学土木工程学院
摘要:受回填土等不平衡堆载作用的被动桩桩身在附加作用下易发生位移,对结构安全将产生不利影响。基于某大跨斜撑钢结构遗址建筑施工过程,采用MIDAS/Gen建立精细化有限元模型,采用m法分析施工过程中承台周围回填土抗力及预应力张拉对桩顶位移及承台扭转的影响,并与实测数据进行对比。分析结果表明:随上部结构施工的进行,在施加预应力和考虑回填土作用的条件下,结构的水平位移控制效果显著;早期进行周围回填土回填,承台水平扭转值小,对结构的影响小。
关键词:遗址建筑;桩基;m法;预应力;有限元模型;堆载作用;位移控制;
作者简介:张丽讷,硕士,主要从事结构工程研究,Email:503160775@qq.com。梁岩,博士,副教授,主要从事复杂工程结构及桥梁结构的研究,Email:liangyan@zzu.edu.cn。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 何志军,丁洁民.大跨钢结构稳定分析几个基本问题的定性讨论[J].四川建筑科学研究,2003,29(3):5-7.
[2] 周德泉,颜超,邓超.堆载作用下桩体工程特性研究[J].中外公路,2015,35(1):5-9.
[3] 杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002,24(4):446-450.
[4] 郭正鹏.郑州地铁隧道开挖对近邻复合桩基影响效应数值分析[D].郑州:郑州大学,2013.
[5] 闫富有,郭正鹏,周同和.隧道开挖对近邻复合桩基的影响效应[J].辽宁科技大学学报,2015,38(1):51-57.
[6] QIAO J S,ZHAO X B.Numerical analysis of the CFG composite foundation’s mechanical properties influenced by lateral soil movement due to heaped loads[J].Applied Mechanics and Materials,2014,501-504:224-227.
[7] 刘四德.侧向堆载下高低承台桩受力性状的对比研究[J].铁道建筑技术,2017(1):14-18.
[8] 王明珉,孙广宇,朱立刚,等.深基坑开挖引起的桩基承载力损失和桩身附加拉力简化计算方法[J].建筑结构,2019,49(22):53-58.
[9] 吴翔艳.定鼎门钢结构仿古建筑组成及力学性能研究[D].西安:长安大学,2010.
[10] 王昌兴,徐珂,田立强.洛阳隋唐城天堂遗址保护建筑结构设计[J].钢结构,2011,26(8):32-36,79.
[11] 姚正源.MIDAS/Gen在空间钢结构设计中的应用[J].建筑结构,2017,47(S1):741-743.
Analysis on influence of construction sequence on displacement of pile foundation for large-span steel structure
ZHANG Line LIANG Yan GUAN Pinwu YU Zheng
(Department of Civil Engineering, Zhengzhou University)
Abstract: Passive piles subjected to unbalanced load such as backfill soil are prone to displacement under additional action, which will have adverse effects on structural safety. Based on construction process of a large-span slanted braced steel structure site building, MIDAS/Gen was used to establish a fine finite element model, and m method was used to analyze the influence of backfill soil resistance around the cap and prestress tension on displacement of pile top and torsion of the cap during the construction process, and the results were compared with the measured data. The analysis results show that with the construction of the superstructure, the horizontal displacement control effect of the structure is significant under the conditions of applying prestress and considering backfill soil action. When the surrounding backfill soil is backfilled in the early stage, the horizontal torsion value of the cap is small and the influence on the structure is small.
Keywords: site building; pile foundation; m method; prestress; finite element model; heap load; displacement control