摘要:以20世纪80年代建造的西安永宁门月城砌体结构去承重墙加固设计为背景,首先介绍了本工程现状,然后对其进行了全面的结构检测及安全鉴定,鉴定结果表明:该结构多处不满足抗震措施,需要进行加固。其次介绍了加固的限制条件与建筑功能需求,限制条件为加固过程不能拆除建筑外墙,改造完成后建筑外观须保持原状;建筑功能由两层办公楼改造成为单层展览空间。再次详细描述了采用内镶框架结构的加固方案和构件加固设计要点。最后对结构进行小震反应谱和大震弹塑性时程分析,计算结果表明,结构加固后满足规范要求。
关键词:砌体结构;加固改造;去承重墙;内镶框架结构;灰土井桩;单跨框架;
作者简介:卢骥,硕士,高级工程师,一级注册结构工程师,主要从事复杂结构设计,Email:93026916@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 张曦光,王骏孙,刘慧珊.建筑抗震鉴定加固手册[M].北京:中国建筑工业出版社,2001.
[2] 建筑抗震鉴定标准:GB 50023—2009[S].北京:建筑工业出版社,2009.
[3] 史铁花.《建筑抗震鉴定标准》(GB 50023—2009)与《建筑抗震加固技术规程》(JGJ 116—2009)疑问解答[M].北京:中国建筑工业出版社,2011.
[4] 建筑抗震加固技术规程:JGJ 116—2009[S].北京:中国建筑工业出版社,2009.
[5] 李国胜.建筑结构裂缝及加层加固疑难问题的处理[M].北京:中国建筑工业出版社,2006.
[6] 建筑结构加固工程施工质量验收规范:GB 50550—2010[S].北京:中国建筑工业出版社,2010.
[7] 强靳毅,张之颖.北京圆楔形灰土井桩的设计计算[J].建筑结构,1996,26(4):38-40.
[8] 混凝土结构加固设计规范:GB 50367—2013[S].北京:中国建筑工业出版社,2013.
[9] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
[10] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
Strengthening design of removing load-bearing wall of masonry structure for Xi'an Half Moon City
LU Ji WEI Sunyin
(China Northwest Architectural Design and Research Institute Co., Ltd.)
Abstract: Based on the strengthening design of removing load-bearing wall of masonry structure for Xi'an Half Moon City built in 1980 s, first the current status of the project were introduced, then a comprehensive structural detection and safety appraisal were carried out, the appraisal results show that the structure does not meet the aseismic measures in many places and need to be reinforced. Secondly, the restriction conditions and the functional requirements of the building were introduced, the restriction conditions were that the external wall of the building cannot be removed during the strengthening process, and the facade of the building must remain unchanged after the reconstruction, and the building function was transformed from two storeies office building into a single storey exhibition space. Thirdly, the strengthening scheme of the inlaid frame structure and the key points of strengthening design for the component were described in detail. Finally, the response spectrum of the structure under small earthquake and the elastoplastic time history of the structure under large earthquake were carried out, and the calculation results show that the structure meets the requirements of the code after strengthening.
Keywords: masonry structure; strengthening and reconstruction; removing load-bearing wall; inlaid frame structure; lime pile; single span frame