混凝土柱局部分拆支顶置换加固技术研究

引用文献:

梁冬 吴杰春 张八秀 王烨璐 曾树森. 混凝土柱局部分拆支顶置换加固技术研究[J]. 建筑结构,2022,48(24):82-87,137.

LIANG Dong WU Jiechun ZHANG Baxiu WANG Yelu ZENG Shusen. Research on replacement and reinforcement technology of partial removal and support top of concrete column[J]. Building Structure,2022,48(24):82-87,137.

作者:梁冬 吴杰春 张八秀 王烨璐 曾树森
单位:广东大宸建筑设计有限公司 广东工业大学土木与交通工程学院
摘要:针对多高层混凝土结构仅下部框架柱局部混凝土强度明显低于设计要求,需要进行加固处理的情况,提出可利用局部分拆混凝土柱且用钢管混凝土柱支顶方法进行置换加固。对几种典型加固方案优缺点进行了分析对比,所提出的加固方法可避免上部质量合格的结构被连带拆除重建,同时具有降低加固成本、缩短工期以及对原结构影响较小等优势。结合某加固工程实例,详细介绍了此加固方法施工流程,即按顺序分部凿除缺陷混凝土,并用钢管混凝土柱内置在凿除处进行支顶;施工过程中内力分析计算结果证明了该加固方法可以满足上部轴力传递要求。最后采用ABAQUS软件对施工过程进行了模拟分析,结果表明,混凝土与钢管应力均小于其设计值,加固后结构是安全的。
关键词:分拆支顶;加固改造;钢筋混凝土柱;置换加固;有限元模拟;
作者简介:梁冬,学士,高级工程师,硕士研究生导师,主要从事检测鉴定与加固设计工作,Email:2485614395@qq.com。吴杰春,硕士研究生,主要从事结构设计工作,Email:1379130630@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 混凝土结构加固设计规范:GB 50367—2013[S].北京:中国建筑工业出版社,2013.
[2] 郑育新.高层建筑混凝土柱整体置换混凝土加固施工方法[J].施工技术,2011,40(21):91-93.
[3] 刘雄.混凝土局部分期置换法在结构加固中的应用研究[D].长沙:湖南大学,2011.
[4] 胡克旭,赵志鹏.混凝土置换法在某短肢剪力墙高层住宅加固中的应用[J].结构工程师,2015,31(5):172-177.
[5] 周晓悦,章雪峰.分批置换混凝土在高层框剪结构加固中的应用实例[J].建筑技术,2012,43(4):365-367.
[6] 杨馨,赵作周,贺小岗,等.钢管支撑滞回性能试验研究[J].建筑结构学报,2015,36(11):124-132.
[7] 李丽,李吉,景鹏旭,等.钢管混凝土柱的非线性变形及受力性能研究[J].建筑结构,2018,48(S2):571-574.
[8] 王艳芬,郑祥斌,毛峰,等.柱局部置换技术的施工和设计计算[J].建筑技术,2007,38(6):430-431.
[9] 混凝土结构设计规范:GB 50010—2010[S].北京:中国建筑工业出版社,2011.
[10] 钱闪光.混凝土梁加固有限元模拟与可靠性分析[J].昆明冶金高等专科学校学报,2016,32(1):54-58.
Research on replacement and reinforcement technology of partial removal and support top of concrete column
LIANG Dong WU Jiechun ZHANG Baxiu WANG Yelu ZENG Shusen
(Guangdong Dachen Architectural Design Co., Ltd. School of Civil and Traffic Engineering, Guangdong University of Technology)
Abstract: In view of the situation that the local concrete strength of the lower frame column of the multi-high-rise concrete structure is obviously lower than that of the design requirements and needs to be strengthened, it is put forward that the method of partial removal of the concrete column and the top structure supported by the concrete filled steel tube column can be used for replacement and reinforcement. The advantages and disadvantages of several typical reinforcement schemes were analyzed and compared, the proposed reinforcement method can avoid the continuous demolition and reconstruction of the superstructure with qualified quality, at the same time, it has the advantages of reducing the reinforcement cost, shortening the construction period, and having less impact on the original structure. Combined with an example of a reinforcement project, the construction process of the reinforcement method was introduced in detail, that is, defective concrete was chiseled in sequence, and the concrete filled steel tube column was built into the chiseling place to support the top structure. The internal force analysis and calculation of the construction process proves that the reinforcement method can meet the requirements of upper axial force transfer. Finally, ABAQUS software was used to simulate and analyze the construction process, and the results show that the stress of concrete and steel pipes are less than their design value, the structure is safe after reinforcement.
Keywords: removal and support top; reinforcement and reconstruction; reinforced concrete column; replacement and reinforcement; finite element simulation