装配式传染病应急医院设计与建造的关注点——武汉火神山医院设计
摘要:武汉火神山医院是中国为应对新型冠状病毒肺炎疫情而建设的应急传染病医疗救治中心,项目从设计到建设完成仅用10天时间,采用装配式技术,秉持环保理念,在医疗分区和流线设计上采取了比普通传染病医院更严格的措施,强化针对医护人员的保护,避免医护人员感染,展现了中国的快速建设能力,以及在极端环境下战胜疫情的信心和决心。
关键词:火神山医院 传染病应急医院 装配式建筑
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
限时优惠福利:领取VIP会员
全年期刊、VIP视频免费!
全年期刊、VIP视频免费!
The Focus for on Design and Construction of the Prefabricated Emergency Hospital for Infectious Diseases:Design of Wuhan Huoshenshan Hospital
Abstract: The Wuhan Huoshenshan Hospital is an emergency rescue and medical treatment center for infectious diseases built to deal with the outbreak of COVID-19. The whole project took only 10 days from design to completion. The project adopts prefabrication technology and the concept of environmental protection. Besides, stricter measures than those adopted by common infectious disease hospitals are adopted in the design of medical zoning and streamline. Meanwhile, it strengthens the protection of medical staff to avoid infection. China has demonstrated to the world the confidence and determination and overcome the epidemic under extreme environments.
Keywords: Huoshenshan Hospital; emergency hospital for infectious diseases; prefabricated building;