室内CFT柱梁节点改造为大跨度跨层桁架节点的加固改造方法

引用文献:

邓梓晖 ,李俊声 ,刘润阳, 周定, 徐重人 ,陈小兵. 室内CFT柱梁节点改造为大跨度跨层桁架节点的加固改造方法[J]. 建筑结构,2022,48(19):138-144,131.

DENG Zihui, LI Junsheng ,LIU Runyang ,ZHOU Ding ,XU Zhongren ,CHEN Xiaobing. Reinforcement and reconstruction method for transforming indoor CFT column beam joints into large-span cross-story truss joints[J]. Building Structure,2022,48(19):138-144,131.

作者:邓梓晖 ,李俊声 ,刘润阳, 周定, 徐重人 ,陈小兵
单位:广州城投发展研究院有限公司 ,广州容柏生建筑结构设计事务所普通合伙) 广州新中轴建设有限公司
摘要:室内钢结构加固改造由于受制于加固顺序、施工条件、安装方式及起重设备的性能等,较外部结构及室外结构的加固改造,具有杆件安装分段更小、数量更多、现场焊接量更大的特点。广州越秀展览中心改造工程中,节点结构功能发生改变,需在钢管混凝土柱(CFT)负荷状态下对节点区进行改造加固。介绍了既有CFT柱梁节点区域加固改造的技术路线、思路、设计条件。重点阐述A、B两类节点加固改造设计,其中A类节点为大跨度越层桁架端部的斜杆交汇节点,B类节点为大跨度跨层桁架端部弦杆节点。从减少现场焊接量、保护原结构、减缓“应力滞后”三个关键目标出发,对加固改造前后的A、B节点进行了应力、损伤等性能分析。最后对节点的焊接工艺要求进行了介绍。本项目已投入使用,节点安全,结构运行良好。
关键词:加固改造;钢结构;大跨度钢桁架;钢管混凝土柱;柱梁节点;焊接残余应力
作者简介:邓梓晖,学士,高级工程师,主要从事结构设计、建设管理等工作,Email:272334165@qq.com。李俊声,学士,工程师,主要从事结构设计、施工及研发等工作,Email:1480328675@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 徐重人,上官瑾瑜,李俊声,等.广州越秀展览中心项目国际会议中心改建结构报告[R].广州:广州容柏生建筑工程设计咨询有限公司,2020.
[2] 上官瑾瑜,李俊声,周定,等.广州越秀展览中心项目改造施工分析报告[R].广州:广州容柏生建筑工程设计咨询有限公司,2020.
[3] 李俊声,上官瑾瑜,周定,等.广州越秀展览中心项目节点改造加固报告[R].广州:广州容柏生建筑工程设计咨询有限公司,2020.
[4] 钢结构加固设计标准:GB 51367—2019[S].北京:中国建筑工业出版社,2019.
[5] 钢结构焊接规范:GB 50661—2011[S].北京:中国建筑工业出版社.2011.
[6] 钢结构工程施工质量验收规范:GB 50205—2001[S].北京:中国建筑工业出版社.2001.
[7] 钢结构现场检测技术标准:GB/T 50621—2010[S].北京:中国建筑工业出版社.2010.
[8] 罗沁,周定,彭欢佳,等.合银广场改造及补强设计[J].建筑结构,2012,42(6):99-102.
[9] 王元清,宗亮,施刚,等.钢结构加固新技术及其应用研究[J].工业建筑,2017,47(2):1-6,22.
[10] 卢亦焱.外粘钢板加固钢管柱承载力试验研究[J].建筑结构,2002,32(4):43-44,18.
[11] 蒋立,王元清,戴国欣,等.焊接加固热作用对工形截面压弯钢构件承载性能的影响[J].土木建筑与环境工程,2016,38(4):96-107.
Reinforcement and reconstruction method for transforming indoor CFT column beam joints into large-span cross-story truss joints
DENG Zihui, LI Junsheng ,LIU Runyang ,ZHOU Ding ,XU Zhongren ,CHEN Xiaobing
(Guangzhou City Construction Investment Group Development Research Institute Co., Ltd. RBS Architectural Engineering Design Associate Guangzhou New Middle Axis Construction Co., Ltd.)
Abstract: Reinforcement and reconstruction of indoor steel structures are subject to the reinforcement sequence, construction conditions, installation methods and performance of lifting equipment, etc., and compared with the reinforcement and reconstruction of the external structure and outdoor structure, it has the characteristics of smaller installation sections, more quantity and larger on-site welding volume. In the reconstruction project of Guangzhou Yuexiu Exhibition Center, the function of the joint structure has changed, and the joint area needs to be reconstructed and strengthened under the load state of the concrete-filled steel tube(CFT) column. The technical route, ideas and design conditions for the reinforcement and reconstruction of the existing CFT column-beam joint area were introduced. The reinforcement and reconstruction design of two types joints A and B were mainly expounded, in which type A joint is the intersection joint of inclined rods at the end of large-span cross-story trusses, and type B joint is chord joint at the ends of large-span cross-story trusses. Starting from the three key goals of reducing the amount of on-site welding, protecting the original structure, and alleviating the "stress lag", the stress, damage and other properties of the type A and B joints before and after reinforcement and reconstruction were analyzed. Finally, the welding process requirements of the joints were introduced. Now the project is put into use, the joints are safe and the structure is running well.
Keywords: reinforcement and reconstruction; steel structure; large-span steel truss; concrete-filled steel tube column; beam-column joint; welding residual stress