粤海金融中心超限高层结构设计

引用文献:

赵颖 江毅 王嵩 黄勇. 粤海金融中心超限高层结构设计[J]. 建筑结构,2022,48(17):66-71.

ZHAO Ying JIANG Yi WANG Song HUANG Yong. Design of out-of-code high-rise structure of Guangdong Holdings Limited Bay Contemporary Center[J]. Building Structure,2022,48(17):66-71.

作者:赵颖 江毅 王嵩 黄勇
单位:华南理工大学建筑设计研究院有限公司 华南理工大学土木与交通学院
摘要:粤海金融中心塔楼A地上建筑高度284.0m,采用带一道伸臂桁架加强层的钢管混凝土柱钢框架+钢筋混凝土核心筒混合结构。其外框由8根柱距为25.5m的巨型钢管混凝土柱和四角悬挑约11m的钢梁组成,为超200m高且仅有8根巨柱组成的带大跨度、大悬挑楼盖的框架-核心筒结构。为提高结构的抗侧刚度,在38层(避难层)设置一道伸臂桁架,与伸臂桁架相连的剪力墙内设置钢桁架。本项目存在扭转不规则、偏心布置、楼板不连续、含加强层等多项超限项,按照设定的性能目标,对结构进行弹性计算、中震验算,并采用Perform-3D软件进行了罕遇地震作用下的弹塑性动力时程分析,针对薄弱部位采取了有针对性的加强措施。结果表明:各项指标均满足规范要求,结构受力合理,安全经济。
关键词:超限高层建筑;伸臂桁架加强层;大跨度;大悬挑;内嵌桁架
作者简介:赵颖,硕士,工程师,一级注册结构工程师,主要从事超高层、复杂建筑结构设计与研究,Email:591759868@qq.com。
基金:企业横向科研基金项目(x2jzD8220290)。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 三诚国际金融中心基坑支护工程岩土工程勘察报告 [R].广州:建材广州地质工程勘察院,2007.
[2] 建筑抗震设计规范:GB 50011—2010 [S].2016年版.北京:中国建筑工业出版社,2016.
[3] 建筑结构荷载规范:GB 50009—2012 [S] .北京:中国建筑工业出版社,2012.
[4] 广东三诚经济发展有限公司珠江新城B1-1项目风洞试验和风振分析报告[R].广州:华南理工大学土木与交通学院,2018.
[5] 建筑工程风洞试验方法标准:JGJ/T 338—2014 [S] .北京:中国建筑工业出版社,2015.
[6] 方鄂华.高层建筑钢筋混凝土结构概念设计[M].2版.北京:机械工业出版社,2014.
[7] 周建龙.超高层建筑结构设计与工程实践[M].上海:同济大学出版社,2017.
[8] 超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[S].北京:中华人民共和国住房和城乡建设部,2015.
[9] 高层建筑混凝土结构技术规程:JGJ 3—2010 [S].北京:中国建筑工业出版社,2011.
[10] 广东省标准高层建筑混凝土结构技术规程:DBJ 15-92—2013[S].北京:中国建筑工业出版社,2013.
Design of out-of-code high-rise structure of Guangdong Holdings Limited Bay Contemporary Center
ZHAO Ying JIANG Yi WANG Song HUANG Yong
(Architectural Design Research Institute of SCUT School of Civil Engineering and Transportation,South China University of Technology)
Abstract: The above ground building height of tower A of Guangdong Holdings Limited Bay Contemporary Center is 284.0 m, and the hybrid structure of CFST steel frame + RC core tube with one outrigger truss reinforcement layer is adopted. Its outer frame is composed of 8 giant concrete-filled steel tubular columns with a column spacing of 25.5 m and steel beams with a cantilever of about 11 m at the four corners. It is the frame-core tube structure with long span and large cantilevered floor, which is over 200 m high and consists of only 8 giant columns. In order to improve the lateral stiffness of the structure, an outrigger truss is set on the 38 floor(refuge floor), and a steel truss is set in the shear wall connected with the outrigger truss. There were many out of limit items in the project, such as irregular torsion, eccentric layout, discontinuous floor slab, including strengthened story and so on. According to the predefined performance objectives, elastic caculation and checking caculation under fortification earthquakes were conducted, and elastic-plastic dynamic time-history analysis under rare earthquakes was carried out by using Perform-3 D software, targeted strengthening measures had been taken for weak areas. The results show that all the indicators meet the requirements of the specification, the structural force is reasonable, and it is safe and economical.
Keywords: out-of-code high-rise building; outrigger truss reinforcement layer; long span; large cantilever; embedded truss