中承式钢桁架系杆拱桥设计与施工关键技术研究

作者:张大鹏
单位:中交第四公路工程局有限公司
摘要:中承式钢桁架系杆拱桥因具有结构体系要经过多次受力转换、关键节点受力大、施工精度要求高、施工控制要求严格等难点,对其设计和施工关键技术进行研究很有必要。以横琴二桥为研究对象,首先介绍了该拱桥主桥约束体系、平纵联及桥面系等关键结构的设计方案;然后结合实际总结出工程的施工特点与技术难点,并在此基础上分别对主桥上、下部结构的施工关键技术进行了分析;最后,借助MIDAS/Civil有限元软件模拟计算出施工过程中应重点监测的最大应力位置,以保证工程的施工质量及安全。
关键词:桥梁工程系杆拱桥中承式钢桁架设计有限元分析施工技术
作者简介:张大鹏,项目经理,高级工程师,E-mail:23700319@qq.com。
基金:广东省交通运输厅科技资助项目:珠海横琴二桥设计施工关键技术研究(科技-2014-02-013)。 -页码-:46-50
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] 蔡亮.某中承式钢管混凝土系杆拱桥施工控制方法[J].中国市政工程,2008(S1):27-29.
[2] 周超舟,姚森.大跨度中承式双肢钢箱系杆提篮拱桥施工方案研究[J].桥梁建设,2008(6):53-56.
[3] 田仲初,李典豪.中承式系杆拱桥施工中系杆张拉方案研究[J].公路与汽运,2015(1):165-168.
[4] 孟续东.宁波春晓大桥主拱施工关键技术研究[J].城市道桥与防洪,2017(6):185-188.
[5] 施力可.钢桁架系杆拱桥节段缆索吊装施工工艺[J].公路交通科技(应用技术版),2018(3):266-267.
[6] 刘丹,秦勇.强风地区钢桁系杆拱桥上部结构施工关键技术研究[J].公路,2016(8):76-81.
[7] 荣学文.钢管混凝土系杆拱桥关键施工过程控制[J].建筑施工,2019,41(4):125-127.
[8] 常怡敏.下承式钢管混凝土系杆拱桥吊杆张拉施工技术分析[J].建筑工程技术与设计,2018(4):262.
[9] 骆双全.南京大胜关长江大桥主桥钢梁主跨合龙技术[J].施工技术,2009,38(10):94-96.
[10] 窦勇芝.中承式钢管混凝土桁架拱桥新增吊杆加固技术[J].施工技术,2014,43(10):69-72.
Design and Key Construction Technology of Half-through Steel Truss Tied Arch Bridge
ZHANG Dapeng
(CCCC Fourth Highway Engineering Co.,Ltd.)
Abstract: Half-through tied steel truss arch bridge construction has many difficulties, such as the structural system has to undergo multiple force conversion, the key nodes are stressed heavily, the construction precision is high, and the construction control requirements are strict, so it is necessary to study the key technology of its design and construction. Taking Hengqin No.2 Bridge as the research object, this paper firstly introduces the design scheme of the key structures of the arch bridge, such as the restraint system of the main bridge, the horizontal longitudinal connection and the bridge deck system, and then sums up the construction characteristics and technical difficulties of the project combined with the actual situation, and on this basis, analyzes the key construction technologies of the upper and lower structures of the main bridge, and finally, with the help of MIDAS/Civil finite element software simulation,in order to ensure the construction quality and safety of the project, the maximum stress position should be monitored in construction process.
Keywords: bridges; tied arch bridges; half-through steel truss; design; finite element analysis; construction