摘要:以北京地铁12号线大蓟区间下穿13号线高架区间为背景,在风险保护设计的基础上,完成了暗挖地铁隧道下穿地铁高架区间三维计算模型的建立,对比分析了不加固、仅洞外加固、洞外加固+桥桩底部加固三种工况下13号线高架区间结构竖向位移、水平位移、差异沉降变化特征,并将计算结果与实测结果进行了对比分析。研究表明:穿越施工显著影响范围约为4倍暗挖地铁隧道跨度;双线间既有结构受叠加施工影响大于双线外结构,是施工监测的关键位置;后施工隧道两侧承台差异沉降大于先施工隧道两侧承台差异沉降;现场监测结果反映了合理的暗挖隧道设计和洞内外风险控制措施是既有地铁线路保护的基础。
关键词:暗挖地铁隧道;地铁高架区间;穿越施工;加固处理;位移控制;
作者简介:唐汐,硕士,高级工程师,主要从事城市轨道交通、项目管理工作,Email:349438318@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 黄鹂,梁小勇,李娴.区间暗挖隧道侧穿既有桥桩施工扰动分析[J].河南科技大学学报(自然科学版),2016,37(4):66-70,75,7.
[2] 宫本福,李宏安,栾文伟.地铁暗挖隧道下穿莲花河及侧穿莲花河桥施工技术方法的研究[J].铁道勘察,2017,43(2):61-67.
[3] 代维达.地铁矿山法区间隧道下穿施工对桥群的影响分析及施工控制[J].铁道建筑,2017,57(9):85-88.
[4] 卢冠群,胡迎迎.软弱地层地铁隧道侧穿桥桩群施工安全控制技术研究[J].湖南交通科技,2019,45(2):146-148,164.
[5] 李勇森,衡明欣,文亮亮,等.北京地铁连拱换乘通道下穿引桥施工沉降控制研究[J].北方工业大学学报,2019,31(5):43-50.
[6] 史锴然,戚幸鑫,卢锋,等.贵阳地铁2号线下穿铁路桥三维数值模拟分析[J].四川建筑,2020,40(2):72-75.
[7] 谭芝文,戴亦军,陈灯强,等.抛填土地层隧道侧穿施工对既有铁路桥墩的影响研究[J].施工技术(中英文),2022,51(6):36-40.
[8] 易领兵,刘鹏,杜明芳,等.暗挖区间下穿施工对高铁桥的影响分析——以北京新机场线区间下穿京沪高铁北京特大桥工程为例[J].隧道建设(中英文),2018,38(S2):126-135.
[9] 王磊,骆建军,高立平,等.地铁隧道斜穿施工对桥桩影响的数值分析[J].北京交通大学学报,2020,44(4):24-33.
[10] 周丁恒,郭华胜,田雪娟,等.暗挖隧道同时下穿铁路桥梁和隧道数值分析[J].安徽理工大学学报(自然科学版),2020,40(6):68-74.
Influence analysis on underground excavation of subway tunnels undercrossing elevated section of existing lines
TANG Xi
(Beijing Railway Construction and Management Co., Ltd. Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit)
Abstract: Taking the background of the section from Dazhongsi Station to Jimenqiao Station of Beijing Metro Line 12 undercrossing elevated section of Beijing Metro Line 13, a 3D calculation model was been built for the underground excavation of subway tunnel undercrossing elevated section based on the risk protection design. The change characteristics of vertical displacement, horizontal displacement and differential settlement of the elevated section structure of Beijing Metro Line 13 under three reinforcement working conditions were compared and analyzed, including non-reinforcement, outside tunnel reinforcement and outside tunnel reinforcement with bridge pile bottom reinforcement. The calculated results were compared with the measured results. The research shows that the significant impact range of the undercrossing construction is about 4 times the span of the underground excavation subway tunnel; the existing structure between the double lines is more affected by the superposition construction than the structure outside the double line, which is a key position for construction monitoring; the differential settlement of the caps on both sides of the tunnel after construction is greater than the differential settlement of the caps on both sides of the previously constructed tunnel; the on-site monitoring results reflect that reasonable underground excavation tunnel design and risk control measures inside and outside the tunnel are the basis for the protection of existing subway lines.
Keywords: underground excavation of subway tunnel; elevated section of subway; undercrossing construction; reinforcement treatment; displacement control