某超限高层建筑复杂连体结构设计

引用文献:

黄明 王志兰 施明征. 某超限高层建筑复杂连体结构设计[J]. 建筑结构,2023,48(02):29-34.

HUANG Ming WANG Zhilan SHI Mingzheng. Design of an out-of-code high-rise building with complex connective structure[J]. Building Structure,2023,48(02):29-34.

作者:黄明 王志兰 施明征
单位:东南大学建筑设计研究院有限公司
摘要:某连体建筑两侧塔楼体型差异较大,为超限高层复杂连体建筑,采用框架-剪力墙+连体桁架的结构体系。针对连体桁架结构选型进行优化分析,针对连体结构整体模型,进行小震弹性分析、中震性能化验算和大震动力弹塑性分析。随后对连体结构的关键问题进行了研究,包括关键构件和节点的设计、抗连续倒塌能力以及大震下结构的变形和损伤情况。分析结果表明,超限高层复杂连体结构的结构体系合理,具有较好的整体性,关键构件和节点的设计均能达到预设的性能目标,且连体结构具有较好的抗连续倒塌能力。
关键词:超限高层建筑;复杂连体结构;连体桁架;抗连续倒塌;
作者简介:黄明,硕士,高级工程师,一级注册结构工程师,主要从事建筑结构设计工作,Email:272914066@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 黄明,王志兰,施明征,等.红山新城可研A1地块新建项目6号楼超限工程抗震设防专项审查报告[R].南京:东南大学建筑设计研究院有限公司,2022.
[2] 刘建涛,王春光,李志文,等.某工程研发楼连体结构设计[J].建筑结构,2018,48(S2):108-112.
[3] 杨霄,蒋炳丽,王力,等.某超大跨连体结构设计[J].建筑结构,2018,48(24):47-52.
[4] 吴小宾,彭志桢,夏宇.某超高层大跨度门形双塔连体结构分析研究[J].建筑结构,2019,49(7):9-14,27.
[5] 徐培福.复杂高层建筑结构设计[M].北京:中国建筑工业出版社,2005.
[6] 杨波,王志明,孙逊.铜陵东部城区综合活动中心大跨度连体结构设计[J].建筑结构,2013,43(S1):1343-1346.
[7] 王爱和.某复杂超限高层建筑的大跨连体结构设计[J].建筑结构,2021,51(20):33-37.
[8] 组合结构设计规范:JGJ 138—2016[S].北京:中国建筑工业出版社,2016.
[9] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[10] 程曦.某复杂大跨连体结构设计[J].建筑结构,2020,50(S1):256-261.
[11] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
Design of an out-of-code high-rise building with complex connective structure
HUANG Ming WANG Zhilan SHI Mingzheng
(Architects & Engineers Co.,Ltd.of Southeast University)
Abstract: The shape of towers on both sides of a connective building is quite different, it belongs to an out-of-code tall building with complex connective structure. The frame-shear wall structural system with connecting truss was adopted. The truss type selection of connective structure were analyzed and optimized. The elastic analysis of frequently-occurred earthquake, performance based seismic design of fortification earthquakes and the dynamic elastic-plastic analysis of rarely-occurred earthquake were carried out. Finally, the key points of connective structure were discussed, including design of key members and joints, the capability of the anti-progressive collapse, the deformation and damage of the structure under rarely-occurred earthquake. The analysis results show that the adopted structure system is suitable to the out-of-code tall building with complex connective structure and has well integrity, the design of key members and joints can reach the prescribed performance target and the connective structure has well anti-progressive collapse capability.
Keywords: out-of-code high-rise building; complex connective structure; connecting truss; anti-progressive collapse