温州国鸿中心超高层塔楼结构设计

引用文献:

任涛 杨学林 高超 徐伟斌 周平槐 华贝 杨璟 刘昌芳. 温州国鸿中心超高层塔楼结构设计[J]. 建筑结构,2022,48(15):8-13.

REN Tao YANG Xuelin GAO Chao XU Weibin ZHOU Pinghuai HUA Bei YANG Jing LIU Changfang. Structural design of super high-rise tower of Wenzhou Guohong Center[J]. Building Structure,2022,48(15):8-13.

作者:任涛 杨学林 高超 徐伟斌 周平槐 华贝 杨璟 刘昌芳
单位:浙江省建筑设计研究院
摘要:温州国鸿中心超高层塔楼地上71层、地下3层,建筑高度为356m,采用钢管混凝土叠合柱-钢梁-钢筋混凝土核心筒混合结构体系。为了提高整体结构刚度,通过比选结构加强层设置方案,确定了加强层数量、伸臂桁架及腰桁架的设置方案。采用基于性能的抗震设计方法,针对不同超限情况采取了相应的技术措施。对结构进行了弹性和弹塑性时程分析,结果表明,结构可满足预设的性能目标。最后介绍了考虑混凝土徐变收缩的施工模拟分析。
关键词:超高层结构;钢管混凝土叠合柱;加强层;施工模拟分析
作者简介:任涛,博士,教授级高级工程师,主要从事建筑结构设计,Email:icerent@163.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 建筑抗震设防分类标准:GB 50223—2008[S].北京:中国建筑工业出版社,2008.
[2] 国鸿财富中心项目B09-04地块-1#楼风洞试验和风振分析报告[R].杭州:浙江大学土木水利工程实验中心,2021.
[3] 侯胜利,赵宏.超高层建筑结构中伸臂桁架的设计实践[J].建筑结构,2018,48(18):15-21.
[4] 周建龙.超高层建筑结构设计与工程实践[M].上海:同济大学出版社,2017.
[5] 钢管混凝土叠合柱结构技术规程:T/CECS 188—2019[S].北京:中国建筑工业出版社,2020.
[6] 超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[A].北京:中华人民共和国住房与城乡建设部,2015.
[7] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[8] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
[9] 三江商务区B09、B11地块建设项目(B09-04地块1#楼)超限高层抗震设防可行性论证报告[R].杭州:浙江省建筑设计研究院,华东建筑设计研究院有限公司,2020.
[10] 公路钢筋混凝土及预应力混凝土桥涵设计规范:JTG 3362—2018[S].北京:人民交通出版社,2018.
[11] 占毅,杨学林,李晓良,等.兰州红楼时代广场施工模拟与混凝土收缩和徐变效应分析[J].建筑结构,2012,42(8):56-61.
Structural design of super high-rise tower of Wenzhou Guohong Center
REN Tao YANG Xuelin GAO Chao XU Weibin ZHOU Pinghuai HUA Bei YANG Jing LIU Changfang
(Zhejiang Province Institute of Architectural Design and Research)
Abstract: The super high-rise tower in Wenzhou Guohong Center has 71 floors overground and 3 floors underground with building height of 356 m. The building adopts hybrid structure system with steel tube-reinforced concrete column-steel beam-reinforcement concrete core tube. Through comparison and selection of structural reinforcement layer setting plans, the number of reinforcement layers, the setting plan of outrigger truss and waist truss were determined to improve the overall structural rigidity. Aims at different overrun situations, technical measures based on performance-based seismic design methods were adopted. The elastic and elastic-plastic time-history analysis of the structure were executed, the results show that the structure can fulfill expected seismic performance targets. Finally, construction simulation analysis considering concrete creep and shrinkage was introduced.
Keywords: super high-rise structure; steel tube-reinforced concrete column; reinforcement layer; construction simulation analysis