摘要:以苏州某坡地建筑地下室为工程背景,结合山脚下高差较大的场地条件,采用了阶梯式地下室建筑方案。以场地土层为微透水层的条件,采用主动的疏水降压减浮的设计方案。经过对地下室基坑渗流量及雨水下渗量的计算分析,结合合理的疏水盲沟布置及可靠的后期运行管理,探讨了该方案的技术可行性。介绍了疏水降压减浮设计方案应用时对建筑、设备、基坑支护、景观、海绵城市等多专业设计提出的相关要求,以及盲沟及地下室肥槽回填施工、盲沟维护、应急预案处理及物业管理等方面的一系列要求及保障措施。结果表明,疏水降压减浮设计方案长期有效,可以确保结构安全。
关键词:坡地建筑,地下室,疏水降压减浮,疏水盲沟,抗浮设计,盲沟维护
作者简介:曹彦凯,学士,高级工程师,一级注册结构工程师,主要从事大型综合体、大跨结构、复杂高层等结构设计研究,Email:yankai.cao@tusdesign.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 周汉香,周越洲,李加成.佛山玖钻广场地下室疏排水渗流计算及评估[J].建筑结构,2019,49(20):121-125.
[2] 建筑地基基础设计规范:GB 50007—2011[S].北京:中国建筑工业出版社,2011.
[3] 建筑工程抗浮技术标准:JGJ 476—2019[S].北京:中国建筑工业出版社,2020.
[4] 刘志祥,张海青.PLAXIS 2D基础教程[M].北京:机械工业出版社,2017.
[5] 建筑与小区雨水控制及利用工程技术规范:GB 50400—2016[S].北京:中国建筑工业出版社,2016.
[6] 建筑给水排水设计标准:GB 50015—2019[S].北京:中国建筑工业出版社,2020.
[7] CASHMAN P M,PREENE M.Groundwater Lowering in construction:a practical guide to dewatering[M].2ed.Boca Raton:CRC Press,2012.
[8] 贾苇,赵锂.全国民用建筑工程设计技术措施(2009):给水排水[M].北京:中国计划出版社,2009.
[9] 干泉,杨博进,刘伟,等.地下室泄水减压抗浮技术的探讨与应用[J].建筑结构,2017,47(2):86-90.
[10] 袁奕.一种地下建筑抗浮的方法:ZL200710052439.9[P].2010-11-10.
Design and analysis of drainage depressurization and floatation reduction in the basement of a building on a slope
CAO Yankai ,YUAN Xuefen ,ZHANG Min, LU Chunhua, SU Peng ,ZHAO Yiqing
(Tus-Design Group Co., Ltd. ,China Overseas Development Group Co., Ltd.)
Abstract: Taking the basement of of a building on a slope in Suzhou as the engineering background, combined with the site conditions with a large height difference at the foot of the mountain, a stepped basement building scheme was adopted. Under the condition that the soil layer of the site is a micro-permeable layer, the design scheme of active drainage depressurization and floatation reduction was adopted. After the calculation and analysis of the seepage flow of the foundation pit and the infiltration of rainwater, combined with the reasonable layout of the drainage blind ditch and the reliable later operation management, the technical feasibility of the scheme was discussed. When the design scheme of drainage depressurization and floatation reduction was used, the relevant requirements of this scheme for multi-professional design such as buildings, equipment, foundation pit support, landscape, and sponge city were introduced. A series of requirements and safeguards for blind ditch and basement fertilizer tank backfill construction, blind ditch maintenance, emergency plan handling and property management were introduced. The results show that the design scheme of drainage depressurization and floatation reduction is effective for a long time and can ensure the safety of the structure.
Keywords: building on a slope; basement; drainage depressurization and floatation reduction; blind drainage ditch; anti floating design; blind ditch maintenance