中阿两国关于砌体填充墙构造措施做法比较与分析

作者:王少奎 黄义鸿 薛彪 黎东海
单位:中国建筑一局集团)有限公司
摘要:以砌体填充墙构造措施为出发点,总结国内填充墙构造措施相关规定,并从设计原则、材料及连接要求方面与阿联酋地区混凝土结构砌体填充墙抗震性能方面的构造措施进行对比分析。调研阿联酋地区7个房建及公共设施类项目设计要求,对当地项目填充墙拉结、构造柱、水平系梁等构造措施要求进行总结分析,并与国内相应规定做出分析比较,归纳出当地常用的构造措施。在填充墙与主体结构连接方面,介绍当地常用连接件及其主要优点和布置原则。
关键词:钢筋混凝土框架砌体填充墙构造柱水平系梁拉结筋
作者简介:王少奎,硕士,工程师,E-mail:1091201706@qq.com。
基金: -页码-:113-116
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] 中国建筑科学研究院.建筑抗震设计规范:GB 50011─2010(2016年版)[S].北京:中国建筑工业出版社,2016.
[2] 清华大学土木工程结构专家组,西南交通大学土木工程结构专家组,北京交通大学土木工程结构专家组,等.汶川地震建筑震害分析[J].建筑结构学报,2008,29(4):1-9.
[3] 中国建筑标准设计研究院.砌体填充墙结构构造:12G614-1[S].北京:中国计划出版社,2012.
[4] Eurocode 8:design of structures for earthquake resistance-part1:general rules,seismic actions and rules for buildings:EN1998-1-2004[S],2004.
[5] 中国建筑东北设计研究院有限公司.砌体结构设计规范:GB 50003-2011[S].北京:中国建筑工业出版社,2011.
[6] 中国建筑标准设计研究院.砌体填充墙构造详图(二):10SG614-2[S].北京:中国计划出版社,2010.
[7] 陕西省建筑科学研究院,陕西建工集团总公司.砌体结构工程施工质量验收规范:GB 50203─2011[S].北京:中国建筑工业出版社,2011.
[8] Code of practice for the use of masonry:BS 5628-2005[S],2005.
Comparison and Analysis of Construction Measures for Masonry Infill Walls Between China and the UAE
WANG Shaokui HUANG Yihong XUE Biao LI Donghai
(China Construction First Group Co., Ltd.)
Abstract: Taking the construction measures of masonry infill walls as the starting point, summarize the relevant regulations of domestic infill wall construction measures, and compare and analyze the structural measures in terms of the seismic performance of concrete structure masonry infill walls in the UAE in terms of design principles, materials and connection requirements. Investigate the design requirements of seven housing construction and public facilities projects in the UAE, summarize and analyze the requirements for structural measures such as infill wall ties, structural columns, and horizontal tie beams in local projects, and analyze and compare with the corresponding domestic regulations, and summarize the local commonly used structural measures. In terms of the connection between the infill wall and the main structure, the local common connectors and their main advantages and layout principles are introduced.
Keywords: reinforced concrete frame; masonry; infill wall; structural columns; horizontal straining beam; tie bar
881 0 0
文字:     A-     A+     默认 取消