某带悬挑复杂连体办公楼结构设计与分析

引用文献:

刘洋,刘永添 ,余永辉, 许建鑫. 某带悬挑复杂连体办公楼结构设计与分析[J]. 建筑结构,2023,48(08):54-61.

LIU Yang ,LIU Yongtian, YU Yonghui ,XU Jianxin. Structural design and analysis on a complex connected structure of office building with cantilever[J]. Building Structure,2023,48(08):54-61.

作者:刘洋,刘永添 ,余永辉, 许建鑫
单位:广州市城市规划勘测设计研究院 奥雅纳工程顾问
摘要:某办公楼为复杂连体结构,局部带大跨度悬挑,同时存在扭转不规则、构件不连续、尺寸突变和承载力突变等多项不规则。采用基于性能化的抗震设计方法,设计时根据构件的重要性采取不同的性能目标,对结构分别进行了小震反应谱、小震弹性时程、中震性能设计、大震弹塑性时程等系列分析,并采取了相应的加强措施;考虑到连接体、悬挑结构的重要性,对结构的关键位置补充了楼板应力、楼板舒适度、施工阶段模拟、防连续倒塌等专项分析。各项分析结果表明,结构整体及各构件的抗震性能均能达到预期目标,结构安全可靠。
关键词:复杂连体结构;悬挑结构;空腹桁架;抗连续倒塌;弹塑性时程;抗震性能设计;
作者简介:刘洋,博士,正高级工程师,主要从事复杂结构设计研究,Email:23972057@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 建筑抗震设计规范:GB 50011—2010[S].北京:中国建筑工业出版社,2010.
[2] 香港科技大学(广州)一期工程C1行政楼超限设计可行性报告[R] .广州:广州市城市规划勘测设计研究院,2021.
[3] 陈飞,李中军,张金库,等.某不对称双塔连体结构设计[J].建筑结构,2017,47(24):6-10,16.
[4] 徐麟,彭林海,裔裕峰,等.某超高层复杂连体结构受力特点及难点分析[J].建筑结构,2020,50(4):106-111,48.
[5] 罗赤宇,廖旭钊,梁银天.某大跨度复杂连体结构抗震设计[J].建筑结构,2019,49(7):35-42.
[6] 杜明军,许平,胡振杰,等.某高位大跨连体超限高层建筑结构设计[J].建筑结构,2019,49(5):83-89.
[7] 金良.深圳某连体及大悬挑高层建筑的结构设计[J].建筑结构,2020,50(S2):22-30.
[8] 徐培福.复杂高层建筑结构设计[M].北京:中国建筑工业出版社,2005.
[9] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[10] 超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[A].北京:中华人民共和国住房与城乡建设部,2015.
[11] 建筑楼盖结构振动舒适度技术标准:JGJ/T 441—2019[S].北京:中国建筑工业出版社,2020.
[12] 组合结构设计规范:JGJ 138—2016[S].北京:中国建筑工业出版社,2016.
Structural design and analysis on a complex connected structure of office building with cantilever
LIU Yang ,LIU Yongtian, YU Yonghui ,XU Jianxin
(Guangzhou Urban Planning & Design Survey Research Institute ,Arup)
Abstract: An office building is a complex connected structure with local large-span cantilever. There are irregularities such as irregular torsion, component discontinuity, abrupt change of plane and bearing capacity. The performance-based seismic design method was carried out and different performance targets were adopted according to the importance of the components. The elastic response spectrum analysis and time-history under frequent earthquakes, the performance design under fortification earthquakes and the elastic-plastic time-history analysis under rare earthquakes were performed in the design and effective measures were taken to strengthen the weak parts of the structure. Considering the importance of the connected structure and cantilever structure, multiple special analyses were conducted including analysis of story stress and comfort, construction simulation and progressive collapse prevention analysis. The analysis results show that the seismic performance of the whole structure and all components can reach the expected performance targets, and the structure is safe and reliable.
Keywords: complex connected structure; cantilever structure; vierendeel truss; progressive collapse prevention; elastic-plastic time-history; performance-based seismic design
556 0 0
文字:     A-     A+     默认 取消