苏州合景太湖新城商务中心超高层结构抗震性能化设计与分析

引用文献:

周慧鑫 郝胜群 李韬 张旺 王学成 王干. 苏州合景太湖新城商务中心超高层结构抗震性能化设计与分析[J]. 建筑结构,2022,48(20):99-103,142.

ZHOU Huixin HAO Shengqun LI Tao ZHANG Wang WANG Xuecheng WANG Gan. Performance-based seismic design and analysis of super high-rise structure in Suzhou Hejing Taihu New Town Business Center[J]. Building Structure,2022,48(20):99-103,142.

作者:周慧鑫 郝胜群 李韬 张旺 王学成 王干
单位:中衡设计集团股份有限公司
摘要:苏州合景太湖新城商务中心地块一的裙房为7层商业,主楼为39层办公楼,主楼偏置于建筑平面北侧,结构平面在7层处有较大收进。主楼采用钢筋混凝土框架-核心筒结构体系,裙房部分采用框架-剪力墙结构体系,裙房与主楼采取不设缝方案。该项目为超限高层建筑,结构具有扭转不规则、塔楼偏置、局部穿层柱以及楼板不连续四项平面不规则项。根据结构不规则判别结果,针对抗震薄弱部位及关键构件选用适当的抗震性能目标,依据不同抗震性能目标采取一系列针对性抗震加强措施。采用SATWE对结构进行了小震弹性时程分析,并采用、MIDAS Building进行了小震弹性时程补充分析;采用SAUSAGE对结构进行大震弹塑性时程分析。结果表明,该项目的结构体系选择合理,具有良好的抗震性能,能够达到预定的抗震性能目标。
关键词:超高层结构;不设防震缝结构;抗震性能目标;抗震性能水准;抗震性能设计;体型收进
作者简介:周慧鑫,硕士,高级工程师,一级注册结构工程师,主要从事商业综合体及超高层结构设计,Email:zhouhuixin@artsgroup.cn。
基金:中衡设计集团科研项目(2019-S3):超高层结构体系与设计技术研究。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[2] 建筑抗震设计规范:GB 50009—2010[S].北京:中国建筑工业出版社,2010.
[3] 超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[A].北京:中华人民共和国住房和城乡建设部,2015.
[4] 建筑结构可靠度设计统一标准:GB 50068—2018[S].北京:中国建筑工业出版社,2018.
[5] 建筑工程抗震设防分类标准:GB 50223—2008[S].北京:中国建筑工业出版社,2008.
[6] 建筑结构荷载规范:GB 50009—2012[S].北京:中国建筑工业出版社,2012.
[7] 赵建忠,郑志刚,王干,等.苏州龙湖某综合体建筑超限高层结构设计[J].建筑结构,2019,39(1):113-119,75.
[8] 江淼,朱寻焱,谈丽华,等.苏州绿地中央广场综合楼超限高层结构设计[J].建筑结构,2019,39(1):125-132.
[9] 周慧鑫,王干,瞿雨舟,等.苏州大悦春风里商业综合体结构设计[J].建筑结构,2021,51(S2):176-180.
[10] 陈磊,赵宏康,陈光,等.苏州宏海国际广场超限高层结构设计[J].建筑结构,2022,52(7):24-27,36.
Performance-based seismic design and analysis of super high-rise structure in Suzhou Hejing Taihu New Town Business Center
ZHOU Huixin HAO Shengqun LI Tao ZHANG Wang WANG Xuecheng WANG Gan
(ARTS Group Co., Ltd.)
Abstract: The podium of plot 1 in Suzhou Hejing Taihu New Town Business Center is a 7-story commercial building, and the main building is a 39-story office building. The main building is located on the north side of the plane, and the structural plane has a larger shape retraction at the 7 th floor. The main building adopts reinforced concrete frame-core tube structure system, and the podium part adopts frame-shear wall structure system, and the podium and the main building adopt the scheme of no seam. The project is an out-of-code high-rise building, and the structure has four plane irregularities, namely, torsional irregularity, tower offset, local cross-layer column, and floor slab discontinuity. According to the results of structural irregularity discrimination, appropriate seismic performance targets were selected for the weak seismic parts and key components, and a series of targeted seismic strengthening measures were taken according to different seismic performance objectives. SATWE was used to conduct elastic time history analysis of the structure under small earthquake, and MIDAS Building was used to conduct elastic time history supplementary analysis of the structure under small earthquake. SAUSAGE was used to conduct elastic-plastic time history analysis of the structure under rare earthquake. The analysis results show that the structural system of the project is reasonably selected, has good seismic performance, and can achieve the predetermined seismic performance targets.
Keywords: super high-rise structure; structure without anti-vibration seam; seismic performance objective; seismic performance level; performance-based seismic design; shape retraction
385 0 0
文字:     A-     A+     默认 取消