苏州国际会议酒店主楼结构设计

引用文献:

郭一峰 谈丽华 杨律磊 孙意斌. 苏州国际会议酒店主楼结构设计[J]. 建筑结构,2022,48(20):71-77,135.

GUO Yifeng TAN Lihua YANG Lülei SUN Yibin. Structural design of the main building of Suzhou International Conference Hotel[J]. Building Structure,2022,48(20):71-77,135.

作者:郭一峰 谈丽华 杨律磊 孙意斌
单位:中衡设计集团股份有限公司
摘要:苏州国际会议酒店主楼为连体结构,结构高度为91.4m,由两栋基本对称的塔楼通过跨度为81m的钢连廊连成一个整体。其中塔楼采用框架-剪力墙结构体系,钢连廊采用桁架结构体系。针对结构特点,对塔楼及连接体进行多遇地震、设防地震和罕遇地震下的分析,对比了结构单塔及整体结构的动力特性及受力性能,探讨了连接体对整体结构受力性能的影响。结合超限情况,对结构进行了性能化设计,并采取了相应的抗震措施对关键性构件进行加强。分析结果表明,结构能够达到既定的性能目标,结构体系合理可靠。针对连廊在施工和使用阶段存在的不利因素,提出了连廊整体提升、支座调平、防坠落等施工措施。
关键词:苏州国际会议酒店;连体结构;弱连接;大跨度;性能化抗震设计
作者简介:郭一峰,硕士,高级工程师,一级注册结构工程师,主要从事超高层结构设计工作,Email:guoyifeng@artsgroup.cn。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 杨律磊,张谨,谈丽华,等.苏州国际会议酒店大跨度高位钢连廊结构设计[J].建筑结构,2022,52(20):112-119,59.
[2] 建筑抗震设计规范:GB 50011—2010[S].北京:中国建筑工业出版社,2010.
[3] 建筑结构荷载规范:GB 50009—2012[S].北京:中国建筑工业出版社,2012.
[4] 潘毅,赵崇锦,常志旺,等.大跨异形钢连廊连体结构振动台试验研究[J].土木工程学报,2019,52(2):66-77.
[5] 高层建筑混凝土结构技术规程:JGJ 3—2010 [S].北京:中国建筑工业出版社,2011.
[6] 汪大绥,包联进.我国超高层建筑结构发展与展望[J].建筑结构,2019,49(19):11-24.
[7] 于岩磊,刘万德,陈建军,等.某三塔多位L形大跨连体高层建筑结构抗震超限设计[J].建筑结构,2022,52(11):88-96.
[8] 汤凯峰.武汉保利关山村K26地块项目四塔多重复杂连体结构设计[J].建筑结构,2020,50(9):50-57,115.
[9] 孙平,丁洁民,莫文峰,等.腾讯滨海大厦连体建筑的工程实践[J].建筑结构,2019,49(21):1-4,21.
[10] 汪大绥,姜文伟,包联进,等.CCTV新台址主楼结构设计与思考[J].建筑结构学报,2008,29(3):1-9.
Structural design of the main building of Suzhou International Conference Hotel
GUO Yifeng TAN Lihua YANG Lülei SUN Yibin
(ARTS Group Co., Ltd.)
Abstract: The main building of Suzhou International Conference Hotel is a connected structure with a structural height of 91.4 m. It consists of two symmetrical towers connected by a steel corridor with a span of 81 m. The tower is a frame-shear wall structure and the steel corridor is a truss structure. According to the structural characteristics, the tower and connector were analyzed under frequent earthquake, fortification earthquake and rare earthquake. The dynamic characteristics and mechanical performance of single tower and overall structure were compared, and the influence of the connector on the mechanical performance of overall structure was discussed. Combined with the over-limit situation, the performance-based design of the structure was carried out, and the corresponding seismic measures were taken to strengthen the key components. The analysis results show that the structure can achieve the established performance goal, indicating that the structural system is reasonable and reliable. The construction measures of overall lifting of the corridor, leveling of the bearings and drop prevention were implemented to prevent disadvantages in the construction and use stage of the corridor.
Keywords: Suzhou International Conference Hotel; connected structure; weak link; large-span; performance-based seismic design