Process design and construction organization of sewage treatment plant under the condition of minimal land use
Abstract: The total scale of a sewage treatment plant in Qingdao is 150 000 m3/d,of which the scale of expansion project is 100 000 m3/d and the scale of transformation project is 50 000 m3/d.The effluent shall be subject to level Discharge standard of pollutants for municipal wastewater treatment plant(GB 18918-2002).The treatment process is Five-stage Bardenpho+MBR.Within the land area of less then 4.5 hectares,the method of joint construction with structures in same area,step-by-step construction and step-by-step water supply was adopted to achieve the goal of not stopping production during the process of project construction.The operation practice shows that the treatment effect of this process is excellent,the system runs stably,the shock resistance load capacity is strong,and the effluent index reaches the design standard.
Keywords: Minimal land use condition; WWTPs; Five-stage Bardenpho; MBR;
957
0
0