工程总承包模式下设计单位的法律风险扩张研究

作者:张晓峰 张少波 王兵
单位:北京市万商天勤律师事务所 浙江工业大学管理学院
摘要:为检验工程总承包模式下设计单位作为联合体成员相较DBB模式下的法律风险扩张,研究Alpha案例库中筛选所得的30篇裁判案例,得出实际施工人、分包工程承包人等项目参与方诉讼行为对于设计单位法律风险的扩张具有正向影响;在此基础上,提出设计单位以紧密型联合体形式参与工程总承包项目时的法律风险防控建议,即重点关注与联合体成员有直接合同关系的参与方风险,并重点关注联合体协议的签署、施工管理、文档与证据管理等,从而在后期可能的争议中减少损失的发生。
关键词:工程总承包联合体连带责任
作者简介:张晓峰,律师、合伙人,研究方向:房地产、建筑工程与基础设施、争议解决。;张少波,律师,研究方向:工程合同管理、项目投融资、诉讼与仲裁。
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] 徐伟,朱建国,沈杰,等.设计施工总承包模式与相关法律制度协调的研究[J].建筑经济,2010(5):111-114.

[2] 欧阳东,赵瑷琳,李克强.论建设工程设计的法律风险防控[J].建筑经济,2015(4):91-94.

[3] Ravanshadnia M,Abbasian H R,Rajaie H.Selecting engineering partner for EPC projects using a fuzzy AHP approach[J].International Journal of Management Science and Engineering Management,2010(4):278-284.

[4] Ozorhon B,Arditi D,Dikmen I,etal.Effect of host country and project conditions in international construction joint ventures[J].International Journal of Project Management,2007(8):799-806.

[5] 王运宏,唐文哲,雷振,等.紧密型工程总承包联合体管理案例研究[J].建筑经济,2019(10):82-86.

[6] 张浩.国际总承包中联合体的法律关系[J].国际经济合作,2013(5):52-55.

[7] 韩如波.工程总承包新政下设计单位面临的主要法律风险及其管理[J].中国勘察设计,2020(5):23-27.

[8] 朱树英.与时俱进及时调整完善建设领域法律体系——《中华人民共和国建筑法》的立法修改建议[J].建筑经济,2003(6):50-55.

[9] 王鹏,范向东.工程总承包模式联合体法律问题研究[J].铁道经济研究,2019(5):27-30.
Research on the Expansion of Legal Risk for the Design Enterprise under the General Contracting Model
ZHANG Xiaofeng ZHANG Shaobo WANG Bing
(V&T LAW FIRM,Beijing School of Management,Zhejiang University of Technology)
Abstract: This paper tries to examine whether the legal risk for the design enterprise as a consortium member under EPC mode would be different from what is under DBB mode.By studying the 30 cases from the search results produced by Alpha,this paper finds that the litigations of the actual constructor and other subcontractors and project parties have a positive effect on the expansion of the legal risks for the design enterprise.This paper further concludes that the design enterprise,when participating in EPC project in the form of a close consortium,should pay more attention to the legal risk of the participants who directly contracted with the consortium members.At the same time,the design enterprise should also focus on the signing of consortium agreement,construction management and the management of documents and evidences,so as to control the loss in the possible subsequent disputes.
Keywords: general contracting; consortium; joint responsibility
599 0 0
文字:     A-     A+     默认 取消