北京工人体育场钢结构屋盖安装超高组合截面支撑体系设计

引用文献:

郭雅兴 徐文汉 刘聪 纪刚. 北京工人体育场钢结构屋盖安装超高组合截面支撑体系设计[J]. 建筑结构,2023,48(06):65-70.

GUO Yaxing XU Wenhan LIU Cong JI Gang. Design of super-high composite section support system for steel structure roof installation of Beijing Workers Stadium[J]. Building Structure,2023,48(06):65-70.

作者:郭雅兴 徐文汉 刘聪 纪刚
单位:北京建工集团有限责任公司 河北省土木工程灾变控制与灾害应急重点实验室 华北科技学院建筑工程学院 江苏泸宁钢机股份有限公司
摘要:北京工人体育场屋盖结构体系受力复杂,杆件局部受力变化对整体结构影响较大,且由于结构整体性强,钢结构成型前需要构件承担施工过程中的自重荷载。为了解决这一个问题,设置了23个超高组合截面临时支撑体系来承受结构自重荷载。对临时支撑体系整体设计进行分析,同时论述了临时支撑的安装及拆除过程;为了保证临时支撑在安装、拆除和使用过程的安全性,采用MIDAS Gen软件进行有限元模拟。结果表明临时支撑能有效承受钢结构未成型时的自重荷载,同时安装、拆除和使用过程中临时支撑的位移和应力均能满足要求。
关键词:北京工人体育场;临时支撑;施工技术;钢结构屋盖;
作者简介:郭雅兴,学士,工程师,主要从事土建施工,Email:820855847@qq.com。刘聪,硕士研究生,主要从事结构设计等方面研究,Email:562037015@qq.com。
基金:河北省省级科技计划资助(22375410D)。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 林泓志,侯文崎,秦学锋,等.大跨度无柱地下车站临时支撑拆除方案优化与现场监测[J/OL].建筑结构学报:1-10 [2023-01-17].DOI:10.14006/j.jzjgxb.2021.0384.
[2] 曹刘坤,杨磊,沈浅灏.预应力混凝土肋梁楼板临时支撑应用及分析[J].建筑施工,2021,43(10):2060-2062.
[3] 王昌彤,曹平周,李德,等.江苏大剧院戏剧厅临时支撑提前拆除方案研究[J].建筑结构,2019,49(14):18-22,61.
[4] 盛平,张龑华,甄伟,等.北京工人体育场结构改造设计方案及关键技术[J].建筑结构,2021,51(19):1-6.
[5] 刘军,田龙强,刘光辉,等.不同形式临时支撑结构在施工全过程模拟中的适用性研究[J].中国建筑金属结构,2022(7):63-66.
[6] 张佳琳,陈潘,方园.双向长悬挑-大跨度钢桁架结构施工安装模拟分析[J].建筑结构,2022,52(S1):2951-2955.
[7] 钢结构设计标准:GB 50017—2017[S].北京:中国建筑工业出版社,2018.
[8] 罗尧治,郑延丰,谢俊乔,等.建筑施工临时支撑结构分类及稳定性分析[J].建筑结构学报,2016,37(4):143-150.
[9] 刘军,田龙强,刘光辉,等.不同形式临时支撑结构在施工全过程模拟中的适用性研究[J].中国建筑金属结构,2022(7):63-66.
[10] 空间网格结构技术规程:JGJ 7—2010[S].北京:中国建筑工业出版社,2010.
Design of super-high composite section support system for steel structure roof installation of Beijing Workers Stadium
GUO Yaxing XU Wenhan LIU Cong JI Gang
(Beijing Construction Engineering Group Co., Ltd. Hebei Key Laboratory of Civil Engineering Catastrophe Control and Disaster Emergency Response Architectural Engineering College, North China Institute of Science and Technology Jiangsu Lu Ning Steel Machinery Co., Ltd.)
Abstract: The structural system of the roof of Beijing Workers Stadium has complex forces, and the local force variation of the bars has a great influence on the overall structure. Moreover, due to the strong structural integrity, the steel structure needs members to bear the dead weight load during the construction process before forming.In order to solve this problem, 23 super-high composite section temporary support systems were set to bear the dead weight load of the structure. The whole design of temporary support system was analyzed, and the installation and unloading process of temporary support were discussed. In order to ensure the safety of temporary support during installation, unloading and using, MIDAS Gen software was used for finite element simulation. The results show that the temporary support can effectively bear the dead weight load when the steel structure is not formed, and the displacement and stress of temporary support can meet the requirements in the process of installation, unloading and using.
Keywords: Beijing Workers Stadium; temporary support; eonstruction technique; steel structure roof