南京江北新区某超高层办公楼结构设计

引用文献:

宋世伟 陈大好 魏大平 陈国强. 南京江北新区某超高层办公楼结构设计[J]. 建筑结构,2023,48(04):68-73.

SONG Shiwei CHEN Dahao WEI Daping CHEN Guoqiang. Structural design of a super high-rise office building in Nanjing Jiangbei New Area[J]. Building Structure,2023,48(04):68-73.

作者:宋世伟 陈大好 魏大平 陈国强
单位:南京长江都市建筑设计股份有限公司
摘要:南京江北新区某超高层办公楼塔楼采用型钢混凝土框架-钢筋混凝土核心筒结构体系。项目平面较规则,竖向刚度和承载力无明显突变,是具有扭转不规则、凹凸不规则、局部不规则多项不规则的超限混合结构。结合抗震设防类别和烈度、结构类型和高度等因素,设计时基于不同性能水准制定不同的抗震性能目标,分析了结构整体受力情况及分叉柱等关键构件和连接节点设计。分析结果表明,塔楼整体结构安全可靠、经济合理,各关键构件和连接节点能够满足设计要求。
关键词:超高层结构;混合结构;超限结构;分叉柱;斜柱;抗震性能化设计;
作者简介:宋世伟,硕士,高级工程师,一级注册结构工程师,主要从事结构设计,Email:190571154@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[2] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
[3] 超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[A].北京:中华人民共和国住房和城乡建设部,2015.
[4] 组合结构设计规范:JGJ 138—2016[S].北京:中国建筑工业出版社,2016.
[5] 李秀英,朱岩松,刘浩,等.北京大望京626地块2号超高层办公楼结构设计[J].建筑结构,2017,47(14):7-12.
[6] 杨建平,沈伟,魏大平,等.南京世茂滨江超高层住宅结构抗震设计[J].建筑结构,2018,48(19):27-30.
[7] 宋世伟,李培培,顾荣勇,等.南京明发国际中心超高层办公楼结构分析[J].建筑结构,2021,51(S1):38-42.
[8] 高层民用建筑钢结构技术规程:JGJ 99—2015[S].北京:中国建筑工业出版社,2016.
[9] 型钢混凝土组合结构技术规程:JGJ 138—2001[S].北京:中国建筑工业出版社,2001.
[10] 混凝土结构设计规范:GB 50010—2010[S].2015年版.北京:中国建筑工业出版社,2015.
[11] 张万开,甄伟,盛平,等.新北京中心三期塔楼结构抗震设计[J].建筑结构,2018,48(20):12-18.
Structural design of a super high-rise office building in Nanjing Jiangbei New Area
SONG Shiwei CHEN Dahao WEI Daping CHEN Guoqiang
(Nanjing Changjiang Urban Architectural Design Co., Ltd.)
Abstract: The tower building of a super high-rise office building in Nanjing Jiangbei New Area adopts steel reinforced concrete frame-reinforced concrete core-wall structural system. The plane of the project is relatively regular, and there is no obvious mutation in the vertical stiffness and bearing capacity. Meanwhile, it is an out-of-code mixed structure with several irregular items, such as torsional irregularity, concave convex irregularity and local irregularity. Combined with the factors such as seismic fortification category and intensity, structure system and height, different seismic performance objectives were formulated based on different performance levels during design. The overall stress condition of the structure were analyzed and the key components and jointing nodes such as bifurcated columns were designed. The analysis results show that the overall structure of tower building is safe, reliable, economical and reasonable, and each key component and jointing node can meet the design requirements.
Keywords: super high-rise building; mixed structure; out-of-code structure; bifurcated column; inclined column; performance-based seismic design