沣西文化中心剧场结构设计与关键问题研究

引用文献:

尹龙星 王洪臣 韦孙印 郜京峰. 沣西文化中心剧场结构设计与关键问题研究[J]. 建筑结构,2022,48(11):43-49.

YIN Longxing WANG Hongchen WEI Sunyin GAO Jingfeng. Research on structural design and key problems of Fengxi Cultural Center theater[J]. Building Structure,2022,48(11):43-49.

作者:尹龙星 王洪臣 韦孙印 郜京峰
单位:中国建筑西北设计研究院有限公司
摘要:沣西文化中心剧场位于垃圾土填埋区,结构采用钢筋混凝土框架+大跨钢结构网架屋盖组合体系。主体结构及工艺设备承载力和变形需求较高,使用SDDC素土桩进行处理并配合钻孔灌注桩进行设计。为研究下部主体结构与上部72m×72m大跨网架屋盖的整体协同工作性能,采用YJK-A软件建立整体模型进行小震弹性与大震弹塑性时程分析,选取合理弹性球型支座参数保证下部主体结构安全可靠。利用3D3S软件对网架结构进行分析及优化设计,为保证网架结构独立建模设计的安全性,使用MIDAS Gen软件对整体模型进行计算及分析验证。研究结果表明,结构整体设计合理,各项指标满足相应规范要求。
关键词:沣西文化中心;组合结构;复合地基;垃圾土;大跨网架;弹性球型支座;协同工作
作者简介:尹龙星,博士,高级工程师,一级注册结构工程师,主要从事钢结构与复杂建筑结构设计与研究,Email:yinlongxing@126.com。
基金:陕西省重点研发计划(2022SF-121)。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 高晰,陸欣,邓中华,等.孔内深层强夯法在处理杂填土地基中的应用[J].建筑结构,2008,38(12):92-94,65.
[2] 孔内深层强夯法技术规程:CECS 197—2006[S].北京:中国计划出版社,2006.
[3] 毛正君,陶志怀,魏荣誉,等.SDDC桩结合灌注桩的垃圾填埋场地基处理施工技术[J].施工技术,2016,45(13):72-74.
[4] 王树,葛家琪,张庆亮,等.大剧院上下结构共同工作对钢屋盖抗震性能影响分析[J].建筑结构,2008,38(12):7-10.
[5] 彭登,王旭松,刘建涛,等.某大跨度种植屋面网架结构设计[J].建筑结构,2018,48(S2):493-497.
[6] 空间网格结构技术规程:JGJ 7—2010[S].北京:中国建筑工业出版社,2011.
[7] 张明亮,李谟康,王少华,等.提升施工技术在张家界荷花机场航站楼网架中的应用[J].钢结构,2016,31(1):68-74.
[8] 赵永全,任玉贺,任源.大跨度网架与下部支承结构协同作用分析[J].建筑结构,2014,44(23):49-53.
[9] 陈丹,杨维国,赵雅,等.海原博物馆上下部结构协同工作性能研究[J].建筑结构,2011,41(3):50-54.
[10] 王昌兴.MIDAS/Gen应用实例教程及疑难解答[M].北京:中国建筑工业出版社,2010.
Research on structural design and key problems of Fengxi Cultural Center theater
YIN Longxing WANG Hongchen WEI Sunyin GAO Jingfeng
(China Northwest Architecture Design and Research Institute Co., Ltd.)
Abstract: The structure of Fengxi Cultural Center theater located in the waste soil landfill area adopts the combined system of reinforced concrete frame structure and long-span steel structure grid roof. The main structure and process equipment have high bearing capacity and deformation requirements. SDDC plain soil piles were used for treatment and designed in cooperation with bored cast-in-place pile. In order to study the overall cooperative performance of the lower main structure and the upper 72 m×72 m long-span steel structure grid roof, YJK-A software was used to establish the overall model for small earthquakes elastic and large earthquakes elastic-plastic time history analysis, and reasonable elastic spherical bearing parameters were selected to ensure the safety and reliability of the lower main structure. 3 D3 S software was used to analyze and optimize the grid structure. In order to ensure the safety of independent modeling and design of grid structure, MIDAS Gen software was used to calculate, analyze and verify the overall model. The results show that the overall design of the structure is reasonable, and all indexes meet the requirements of the corresponding specifications.
Keywords: Fengxi Cultural Center; composite structure; composite foundation; waste soil; large-span space truss; elastic spherical bearing; cooperative work