摘要:黄浦路106号历史保护建筑“红楼”为三层砖木结构,根据周边规划要求,需整体提升6m,底部增加一层。介绍了针对这些改造所采取的特殊应对措施及其设计方法,包括:采用桩基础整体托换主动保护方案,解决建筑局部倾斜的问题;整体顶升为增层提供条件,增层下设置隔震层,减小原砌体结构各层层间剪力,使其小于顶升前后砌体结构各层层间剪力以及小于原有砌体结构各层水平抗剪能力,从而实现改造同时提升历史保护建筑的整体受力和抗震性能的目标。
关键词:红楼,历史保护建筑,主动保护方案,桩基础托换,结构整体顶升,隔震支座,黏滞阻尼器
作者简介:苏骏,学士,教授级高级工程师,主要从事结构设计工作,Email:sj0488@ecadi.com。
基金:上海市社会发展科技攻关项目(20DZ1202402)。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 黄浦路106号历史保护建筑修缮改造检测报告[R].上海:同济大学房屋质量监测站,2020.
[2] 砌体结构设计规范:GB 50003—2011[S].北京:中国建筑工业出版社,2011.
[3] 施楚贤.砌体结构理论与设计[M].2版.北京:中国建筑工业出版社,2003.
[4] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
[5] 建筑消能减震技术规程:JGJ 297—2013[S].北京:中国建筑工业出版社,2013.
[6] 建筑隔震橡胶支座:JG/T 118—2018[S].北京:中国建筑工业出版社,2018.
[7] 叠层橡胶支座隔震技术规程:CECS 126∶2001[S].北京:中国工程建设标准化协会,2001.
[8] 建筑抗震设计规程:DBJ 08-9—2013[S].上海:上海市建筑建材业市场管理总站,2013.
[9] 建筑结构消能减震(振)设计:建质[2009]8号[A].北京:中华人民共和国住房和城乡建设部,2009.
[10] 刘桂秋.砌体结构基本受力性能的研究[D].长沙:湖南大学,2005.
Underpinning lifting and isolation design of historical protection building reconstruction project at No.106 Huangpu Road in Shanghai
SU Jun ZHOU Jianlong ZHOU Jian WU Jiangbin LIU Jianqiang
(East China Architectural Design & Research Institute Co., Ltd.)
Abstract: The historical protection building in No. 106 Huangpu Road is a three-story brick-timber structure. According to the surrounding planning requirements, it needs to be lifted 6 m, with an additional layer at the bottom. The special countermeasures and design methods adopted for these modification was introduced, including the overall underpinning active protecting the pile foundation scheme to solve the problem of local leaning of the building. The overall lifting provides conditions for adding floors. Isolation layer was added to the new floor, which reduces the shear force between each layer of the original masonry structure, making the interlayer shear force smaller than each layer of the masonry structure before and after lifting, and less than each layer of the horizontal shear capacity of the original masonry structure so as to achieve the goal of improving the overall force and seismic performance of the historical protection building at the same time.
Keywords: red building; historical protection building; active protection scheme; underpinning of pile foundation; structural overall lifting; isolation bearing; viscous damper