摘要:台州某商业广场地上4层,地下2层,结构高度23.7m。地下室全长310m不设伸缩缝,地上东西向长286.2m,南北向长90.9m,仅根据建筑功能在中间设置一道防震缝兼伸缩缝,其中西侧长度184.5m,东侧长度101.7m。项目东北角主入口处因造型及功能需要设置双向25.5m钢桁架大悬挑,同时内中庭及南侧二层外廊存在多处托柱转换及大跨度。简要介绍了项目的结构体系、基础形式,重点介绍了超长结构温度作用计算过程,并指出了型钢混凝土与普通混凝土超长结构在温度荷载作用下计算方法的不同之处以及相应的处理办法。此外,对主入口大悬挑钢桁架进行了详细的计算对比分析,并进行了防倒塌设计,确保了大悬挑结构的经济性和安全性。
关键词:超长结构;温度作用;大悬挑桁架;型钢混凝土;
作者简介:苗伟,硕士,高级工程师,一级注册结构工程师,主要从事建筑结构设计工作,Email:32195491@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 苗伟.冲钻孔灌注桩后注浆在工程中的实际应用及技术探讨[J].福建建筑,2013,(1):80-82,95.
[2] 建筑结构荷载规范:GB 50009—2012[S].北京:中国建筑工业出版社,2012.
[3] 王铁梦.工程结构裂缝控制[M].北京:中国建筑工业出版社,2017.
[4] 吴雨璇,范重,牟在根.超长框架结构地下部分温度作用分析[C]//第二十届全国现代结构工程学术研讨会论文集.石家庄,2020:43-48.
[5] 范重,陈巍,李夏,等.超长框架结构温度作用研究[J].建筑结构学报,2018,39(1):136-145.
[6] 谭坚,区彤,戴朋森,等.广州白云国际机场三号航站楼超长结构分析与设计[J].建筑结构,2022,52(21):66-72.
[7] 建筑结构计算软件YJK-A用户手册及技术条件[M].北京:北京盈建科软件股份有限公司,2018.
[8] 吕恒柱,孙亚萍,徐从荣,等.某商业广场结构设计关键技术[J].建筑结构,2019,49(3):20-27,31.
[9] 姚开明,詹乐斌,朱奇,等.某商业综合体大悬挑结构设计与分析[J].建筑结构,2021,51(7):91-97.
[10] 高层民用建筑钢结构技术规程:JGJ 99—2015[S].北京:中国建筑工业出版社,2015.
[11] 建筑结构抗倒塌设计规范:CECS 392∶2014[S].北京:中国计划出版社,2014.
[12] 吴晖,旷继光,陈海军,等.深圳腾讯滨海大厦设计若干关键要点[J].建筑结构,2013,43(S1):33-38.
Design of super-long structure and large cantilever of a commercial plaza in Taizhou
MIAO Wei
(Zhejiang Green City Architectural Design Co., Ltd.,Xiamen Branch)
Abstract: The commercial plaza in Taizhou has four floors above ground and two floors underground, whose height is 23.7 meters. The basement length of this plaza is 310 meters without expansion joints. For the above ground of this plaza, whose east-to-west length is 286.2 meters and north-to-south length is 90.9 meters, there is only one seismic joint which is doubled expansion joint in the middel according to the building function. There are 184.5 meters for the west side of the seismic joint and 101.7 meters for the east side. The main entrance of the northeast corner of the plaza set a two-side 25.5 meters steel truss cantilever because of the architectural figure and functional requires. At the same time, there are many columns conversion and large-span in the inner atrium and the second floor corridor on the south side. The structure system and foundation type of the plaza was briefly introduced, the calculation process of super-long structure thermal action was highlighted and the differences of the analytical method between super-long steel reinforced concrete structure and ordinary concrete structure under temperature load were narrated, also the corresponding treatment method was given. Meanwhile, the large cantilever steel truss at main entrance was calculated and analyzed in detail, and the anti-collapse design was adopt to ensure the economy and safety of the large cantilever structure.
Keywords: super-long structure; temperature load; large cantilever truss; steel reinforced concrete