PPP项目变更影响因素研究
摘要:在PPP实践中,变更已成为项目失败的主要原因之一。本研究通过多案例分析,识别包括政府管理能力不足、政府信誉不佳、市场环境等导致PPP项目变更的主要影响因素。进而,通过揭示变更因素之间的关联关系,深入剖析多因素共同作用从而导致项目重大变更的内在作用机理;同时对不同类型项目的变更影因素的差异性进行分析,在此基础上为参与PPP项目的政府方和社会资本方提出有效管理PPP项目变更的对策建议。
关键词:PPP变更因素案例分析社会网络分析
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
限时优惠福利:领取VIP会员
全年期刊、VIP视频免费!
全年期刊、VIP视频免费!
参考文献[1] 宋金波,静常,靳璐璐.BOT项目提前终止关键影响因素--基于多案例的研究[J].管理案例研究与评论,2014(1):86-95.
[2] 杜滨炜.公私合作项目变更研究[J].项目管理技术,2017(4):40-46.
[3] Demirel HÇ,Volker L,Leendertse W,etal.Dealing with Contract Variations in PPPs:Social Mechanisms and Contract Management in Infrastructure Projects[J].Journal of Construction Engineering and Management,2019(11):4019073.
[4] Isaac S,Navon R.Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects[J].Journal of Construction Engineering and Management,2008(2):139-145.
[5] Hwang B,Low L K.Construction project change management in Singapore:Status,importance and impact[J].International Journal of Project Management,2012(7):817-826.
[6] 沈俊鑫,卢雨鑫,王晓萍.清库政策对PPP可持续发展的影响研究[J].建筑经济,2022(8):5-14.
[7] 徐钝.PPP项目合同履约中的机会主义风险及其防范--以不完全契约理论为分析视角[J].行政与法,2022(10):100-108.
[2] 杜滨炜.公私合作项目变更研究[J].项目管理技术,2017(4):40-46.
[3] Demirel HÇ,Volker L,Leendertse W,etal.Dealing with Contract Variations in PPPs:Social Mechanisms and Contract Management in Infrastructure Projects[J].Journal of Construction Engineering and Management,2019(11):4019073.
[4] Isaac S,Navon R.Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects[J].Journal of Construction Engineering and Management,2008(2):139-145.
[5] Hwang B,Low L K.Construction project change management in Singapore:Status,importance and impact[J].International Journal of Project Management,2012(7):817-826.
[6] 沈俊鑫,卢雨鑫,王晓萍.清库政策对PPP可持续发展的影响研究[J].建筑经济,2022(8):5-14.
[7] 徐钝.PPP项目合同履约中的机会主义风险及其防范--以不完全契约理论为分析视角[J].行政与法,2022(10):100-108.
Research on Influencing Factors of Change of PPP Project
Abstract: In PPP projects,change has become one of the main causes of project failure.Through multiple case studies,this study identifies the main factors that led to changes in PPP projects,including insufficient government management capacity,poor government reputation,and market environment. Then,by revealing the relationship between the change factors,deeply analyzes the internal mechanism of the joint action of multiple factors leading to major changes in the project. At the same time,analyzes the differences of change influencing factors among different types of projects. Then proposes countermeasures and suggestions for the government and social capital parties involved in PPP projects to effectively manage changes in PPP projects.
Keywords: PPP; change factors; case analysis; social network analysis;
1153
0
0