招商银行总部大厦核心筒偏置超高层结构设计与关键技术研究

引用文献:

李建伟 王宁 张崇新 容文豪 赵勇. 招商银行总部大厦核心筒偏置超高层结构设计与关键技术研究[J]. 建筑结构,2023,48(09):16-24.

LI Jianwei WANG Ning ZHANG Chongxin RONG Wenhao ZHAO Yong. Research on structural design and key technology of super high-rise China Merchants Bank Headquarters Building with off-centre core tube[J]. Building Structure,2023,48(09):16-24.

作者:李建伟 王宁 张崇新 容文豪 赵勇
单位:悉地国际设计顾问深圳)有限公司 香港华艺设计顾问深圳)有限公司
摘要:招商银行总部大厦是一栋387m高的超高层建筑,采用框架-偏心筒-环带桁架-伸臂桁架结构体系,核心筒偏置于建筑北侧,设5个伸臂桁架加强层。采用合理设计核心筒剪力墙厚度、增设环带桁架等措施,减小了核心筒偏置对结构的不利影响。在伸臂桁架中通过设置屈曲约束支撑(BRB),提高了整体结构的抗震性能。利用屋顶水箱设置调谐液体阻尼器(TLD),减轻了结构风振效应。大跨楼盖跨中增设钢次梁,减小了楼盖人致振动加速度。同时展开了结构整体稳定性、墙体受拉应力控制、长期荷载下的水平位移控制等多项研究,确保了该核心筒偏置的超高层结构的安全,所采取的设计方法和措施可供同类工程参考。
关键词:招商银行总部大厦;超高层结构;核心筒偏置;屈曲约束支撑BRB);销轴节点;减腋开洞钢梁;调谐液体阻尼器TLD);伸臂桁架;
作者简介:李建伟,学士,正高级工程师,一级注册结构工程师,主要从事超高层建筑结构设计与研究,Email:690780525@qq.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] Foster +Partners,悉地国际设计顾问(深圳)有限公司.招商银行总部大厦项目抗震设防超限审查论证报告[R].深圳:悉地国际设计顾问(深圳)有限公司,2021.
[2] 招商银行总部大厦项目风洞试验研究[R].北京:中国建研院建研科技股份有限公司,2021.
[3] 高层建筑钢-混凝土混合结构技术规程:DBJ/T 15-128—2017[S].北京:中国建筑工业出版社,2018.
[4] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[5] 陆天天,赵昕,丁洁民,等.上海中心大厦结构整体稳定性分析及巨型柱计算长度研究[J].建筑结构学报,2011,32(7):8-14.
[6] 钢结构设计标准:GB 50017—2017[S].北京:中国建筑工业出版社,2018.
[7] Eurocode 3:design of steel structures-part 1-1:general rules and rules for buildings:EN 1993-1-1 [S].Brussels:European Committee for Standardization,2005.
[8] Minimum design loads and associated criteria for buildings and other structuren:ASCE 7-16[S].Virginia:American Society of Civil Engineers,2017.
[9] 哈敏强,潘浩浩,时磊,等.宁波绿地中心结构整体稳定性分析和TLD风振控制[J].建筑结构,2015,45(7):25-31.
[10] 董平,陈招平.矩形 TLD 在结构振动控制中的性能试验研究[J].工业建筑,2006,36(2):8-10.
[11] 傅学怡,曲家新,陈贤川,等.时程频谱结合分析方法对展望桥人行舒适度的分析与控制[J].土木工程学报,2011,44(10):73-80.
[12] 建筑楼盖振动舒适度技术标准:JGJ/T 441—2019[S].北京:中国建筑工业出版社,2019.
[13] 傅学怡.实用高层建筑结构设计[M].2版.北京:中国建筑工业出版社,2010.
Research on structural design and key technology of super high-rise China Merchants Bank Headquarters Building with off-centre core tube
LI Jianwei WANG Ning ZHANG Chongxin RONG Wenhao ZHAO Yong
(China Construction (Shenzhen) Design International Co., Ltd. Hong Kong Hua Yi Design Consultants (Shenzhen) Co., Ltd.)
Abstract: China Merchants Bank Headquarters Building is a super high-rise building with the height of 387m, and adopts frame-off-centre core tube-belt truss-outrigger truss structure systems. The off-centre core tube is located in the north of the building, and five outrigger trusses reinforcement layers are set. Measures such as reasonable design of shear wall thickness of core tube and adding ring truss were adopted,which reduces the negative impacts of the off-centre core tube on the structure. The seismic performance of the overall structure is improved by utilizing the buckling restrained braces(BRBs) in the outrigger trusses. The roof tuned liquid damper(TLD) is set in the roof water tank to reduce the wind vibration effect of the structure. In order to reduce the floor vertical acceleration induced by human, horizonal steel beams in the middle of the long-span floor have been added. Meanwhile, a number of studies were carried out on the structural overall stability, the control of the tensile stress in the shear walls and the horizontal displacements under the long-term loads, etc., to ensure the safety of the super high-rise structure with off-centre core tube. The design methods and measures adopted can be referred to the similar projects.
Keywords: China Merchants Bank Headquarters Building; super high-rise structure; off-centre core tube; buckling restrained brace(BRB); pin node; haunched steel beams with web-opening; tuned liquid damper(TLD); outrigger truss