PSB精轧螺纹钢预应力扩大头抗浮锚杆的工程应用研究

引用文献:

罗东林 李欣洧 廖宏业 冯远. PSB精轧螺纹钢预应力扩大头抗浮锚杆的工程应用研究[J]. 建筑结构,2022,48(14):146-150,123.

LUO Donglin LI Xinwei LIAO Hongye FENG Yuan. Engineering application of the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar[J]. Building Structure,2022,48(14):146-150,123.

作者:罗东林 李欣洧 廖宏业 冯远
单位:中冶成都勘察研究总院有限公司 成都天府国际生物城投资开发有限公司 中国建筑西南设计研究院有限公司
摘要:依托成都天府国际生物城污水处理厂PSB精轧螺纹钢预应力扩大头抗浮锚杆项目,介绍了PSB精轧螺纹钢预应力扩大头抗浮锚杆的结构特点、施工工艺及施工方法。探讨了在西南泥岩地区采用PSB精轧螺纹钢预应力扩大头抗浮锚杆在提高锚杆锚固效果、提高锚杆承载力、施加预应力控制锚杆裂缝以提锚杆耐久性等方面的实际效果。研究结果表明:采用PSB精轧螺纹钢筋节约了钢筋用量,提高了单根锚杆承载力;PSB精轧螺纹钢筋预应力扩大头抗浮锚杆在成都天府国际生物城污水处理厂项目的成功应用,解决了泥岩地区基岩裂隙水丰富情况下采用普通锚杆容易失效问题;利用预应力施工技术控制锚杆裂缝,解决了锚杆耐久性问题,且节省了工期、节约了成本,具有良好的社会效益。
关键词:扩大头抗浮锚杆;PSB精轧螺纹钢;预应力;裂缝控制
作者简介:罗东林,学士,高级工程师,主要从事岩土工程施工,勘察设计及咨询,Email:a13881808803@126.com。李欣洧,学士,高级工程师,主要从事建筑工程咨询、管理,Email:lixinwei@cdbtgroup.com。
基金:
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 成都地区建筑地基基础设计规范:DB51/T 5026—2001[S].成都:四川省质量技术监督局,2001.
[2] 建筑工程抗浮技术标准:JGJ 476—2019[S].北京:中国建筑工业出版社,2019.
[3] 混凝土结构设计规范:GB 50010—2010 [S].2015年版.北京:中国建筑工业出版社,2015.
[4] 生物城污水处理厂项目抗浮锚杆工程设计方案[R].成都:中冶成都勘察研究总院有限公司,2019.
[5] 预应力混凝土用螺纹钢筋:GB/T 20065—2016[S].北京:中国标准出版社,2017.
[6] 高压喷射扩大头锚杆技术规程:JGJ/T 282—2012[S].北京:中国建筑工业出版社,2012.
[7] 生物城污水处理厂岩土工程勘察报告[R].成都:四川省地质工程勘察院,2019.
[8] 生物城污水处理厂及污水干管一期工程设计文件[R].成都:中国市政工程西南设计研究总院有限公司,2019.
[9] 岩土锚杆(索)技术规程:CECS 22—2005[S].北京:中国计划出版社,2005.
[10] 四川省建筑地下结构抗浮锚杆技术标准:DBJ51/T 102—2018[S].成都:西南交通大学出版社,2019.
[11] 成都市城乡建设委员会.成都市城乡建设委员会关于印发《成都市建筑工程抗浮锚杆质量管理规程》的通知[EB/OL].(2018-09-06)[2022-06-17].http://cdzj.chengdu.gov.cn/cdzj/c131968/2018-10/15/content_e27a42cafa174781b93a305b80a1aef8.shtml.
[12] 生物城污水处理厂抗浮锚杆检测报告[R].成都:成都市建工质量检验测试站,2020.
Engineering application of the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar
LUO Donglin LI Xinwei LIAO Hongye FENG Yuan
(Chengdu Survey Geotechnical Research Institute Co.,Ltd.of MCC Chengdu Tianfu International Bio-town Investment & Development Co.,Ltd. China Southwest Architecture Design And Research Institute Co.,Ltd.)
Abstract: Based on the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar in the sewage treatment plant of Chengdu Tianfu International bio-town, the structural characteristics, construction technology and construction method of the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar were introduced. The practical effects of the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar in southwest mudstone area on improving the anchoring effect of anchor, improving the bearing capacity of anchor, and applying prestress to control anchor cracks to improve the durability of anchor were discussed. The results show that the use of PSB finishing rolled rebar saves the amount of reinforcement and improves the bearing capacity of single anchor rod.The successful application of the pre-stressed anti-floating anchor with enlarged head project of PSB finishing rolling rebar in the sewage treatment plant of Chengdu Tianfu International bio-town solves the problem of easy failure of ordinary anchor rod under the condition of abundant bedrock fissure water in mudstone area. The prestressed construction technology was used to control the crack of anchor rod, which solves the problem of anchor rod durability, saves the construction period and cost, and has good social benefits.
Keywords: anti-floating anchor with enlarged head; PSB finishing rolled screw steel; prestressed; crack control