摘要:新开发银行总部大楼塔楼采用钢管混凝土柱框架-核心筒结构体系。外框大柱采用钢管混凝土柱并沿平面6个角点均匀布置;外框大梁采用钢桁架,分别在8、14、20、26层设置形成环带桁架,与外框大柱共同组成了巨型外框;核心筒平面为六边形并在6个角部设置了钢骨。塔楼以国内、外结构设计标准和银行、健康材料、室内环境等行业标准为设计依据,以建筑、结构高融合度为设计目标和理念,最终形成了巨型框架-核心筒结构体系。通过采用结构抗震性能化设计手段,以及同时考虑防连续倒塌的关键节点有限元分析、大跨楼盖人行振动舒适度分析等专项分析方法,研究和验证了巨型框架受力特点下该结构体系在本项目中的适用性及合理性,实现了金砖银行塔楼的高设计标准、高融合度、优异结构性能的预定目标。
关键词:钢管混凝土柱;环带桁架;巨型外框;抗震性能化设计;节点有限元分析
作者简介:郁晓铭,硕士,一级注册结构工程师,主要从事复杂高层和空间结构设计研究,Email:xiaoming_yu@ecadi.com。*姜文伟,学士,教授级高级工程师,一级注册结构工程师,主要从事超高层和空间结构设计研究,Email:wenwei_jiang@ecadi.com。
基金:“上海超高层建筑设计工程技术研究中心”建设项目(14DZ2252800);上海市青年科技启明星计划资助项目(19QB1400600)。
尊敬的用户,本篇文章需要2元,点击支付交费后阅读
参考文献[1] 高层建筑混凝土结构技术规程:JGJ 3—2010[S].北京:中国建筑工业出版社,2011.
[2] 银行金库:JT/T 0003—2000[S].北京:行业标准-金融,2000.
[3] 数据中心设计规范:GB 50174—2017[S].北京:中国计划出版社,2017.
[4] 建筑材料放射性核素限量:GB 6566—2010[S].北京:中国标准出版社,2010.
[5] 民用建筑工程室内环境污染控制规范:GB 50325—2010 [S].2013年版.北京:中国计划出版社,2013.
[6] 高层建筑混凝土结构技术规程:DBJ 15-92—2021[S].北京:中国建筑工业出版社,2021.
[7] 建筑抗震设计规范:GB 50011—2010[S].2016年版.北京:中国建筑工业出版社,2016.
[8] 周建龙,包联进,钱鹏,等.深湾汇云中心T1塔楼结构设计[J].建筑结构,2017,47(12):41-47.
[9] 姜文伟,陆道渊,刘灿,等.天津现代城办公塔楼抗震设计研究[J].建筑结构,2012,42(5):68-73.
[10] 周建龙,周健,陈锴,等.武汉中心塔楼结构设计[J].建筑结构,2012,42(5):8-12.
[11] 建筑振动荷载标准:GB/T 51228—2017[S].北京:中国建筑工业出版社,2017.
Structural design of New Development Bank Headquarters tower
YU Xiaoming JIANG Wenwei
(East China Architectural Design & Research Institute Co.,Ltd.)
Abstract: New Development Bank Headquarters tower adopts concrete-filled steel tubular column frame-core tube structure system. The outer frame columns were made of concrete-filled steel tubular columns and were evenly arranged along the 6 corners of the plane; the outer frame beams were made of steel trusses, which are set on the 8 th, 14 th, 20 th, and 26 th floors to form ring-belt trusses, which together with the outer frame columns form a giant outer frame. The plane of the core tube is hexagonal and steel frames were arranged at 6 corners. The tower is designed based on domestic and foreign structural design standards and industry standards such as bank, health materials and indoor environment, and takes the high integration of architecture and structure as the design goal and concept, forming a giant frame-core tube structure system. Through the use of structural seismic performance-based design methods, as well as special analysis methods such as finite element analysis of key joints considering continuous collapse prevention design & seismic performance-based design, and pedestrian vibration comfort analysis, it is studied and verified that the structural system under the stress characteristics of the giant frame is suitable for this structure. The applicability and rationality of the project have achieved the predetermined goals of high design standards, high integration, and excellent structural performance for the BRICS Bank tower.
Keywords: concrete-filled steel tubular column; ring belt truss; giant outer frame; seismic performance design; finite element analysis of joint